Bolt CPO Charging Station EV charging — 1 locations

1 Bolt CPO Charging Station charging locations in Gangavhare. 0 connectors available now with fresh status.

Stations

Aria resort and spa

Bolt CPO Charging Station

Gangapur, Nashik, Maharashtra 422222, Gangavhare

In use · up to 7 kW

Type 2 · 7 kW

Other connector types in Gangavhare

FAQ

How many EV charging locations are in Bolt CPO Charging Station in Gangavhare?

We list 1 public charging locations in Bolt CPO Charging Station in Gangavhare from connected OCPI feeds.

How many fast chargers are in Bolt CPO Charging Station in Gangavhare?

About 0 locations include DC fast charging (50 kW or DC connector types).

Which operators operate in Bolt CPO Charging Station in Gangavhare?

Networks on the map include Bolt CPO Charging Station. Counts change as operators connect feeds.

How many chargers show as available right now?

0 connectors currently report available with fresh OCPI status (same rules as the live map).

View on live map