Bolt CPO Charging Station EV charging — 1 locations
1 Bolt CPO Charging Station charging locations in Gurugram. 1 connectors available now with fresh status.
- 1 locations
- 0 with DC fast
- 1 connectors available now (fresh status)
Stations
Devyani International
Bolt CPO Charging Station
Meerut Division,201309,Uttar Pradesh, Gurugram
Available · up to 22 kW
Type 2 · 22 kW
Other connector types in Gurugram
FAQ
How many EV charging locations are in Bolt CPO Charging Station in Gurugram?
We list 1 public charging locations in Bolt CPO Charging Station in Gurugram from connected OCPI feeds.
How many fast chargers are in Bolt CPO Charging Station in Gurugram?
About 0 locations include DC fast charging (50 kW or DC connector types).
Which operators operate in Bolt CPO Charging Station in Gurugram?
Networks on the map include Bolt CPO Charging Station. Counts change as operators connect feeds.
How many chargers show as available right now?
1 connectors currently report available with fresh OCPI status (same rules as the live map).